Every BGA order passes 100% X-Ray inspection: ball alignment, bridging, voids (per IPC-7095 limits) and head-in-pillow indicators are checked and archived. AOI cannot see under the package - X-Ray can, and we do not skip it.
Profiled hot-gas rework stations remove and replace BGAs up to 45 mm square: site dressing, solder-ball re-attach for strip balls, and post-rework X-Ray re-verification. Rework is available both for our own builds (repair loops) and for customer-supplied boards.
Planning a 0.25 mm pitch build? Send your centroid file with the assembly quote and we confirm placement capability before you commit.
Send your centroid file — we confirm feasibility within 24 hours.